Long Leaded Right Hand Intermediate Cavity Wall Tray - 27°
- Supplied With Factory Fitted Lead
- Fits All Cavity Sizes up to 125mm
- Satisfies All NHBC Requirements
- Manufactured to BSENISO 9001
- Manufactured to BSENISO 14001
Downloads
Ideal for new build roofing projects, This Cavity Tray comes in left and right handed options and is designed to be built into each course up the rake of the roof. Each tray has an end upstand so water can only discharge via the open end of the tray. This product provides you with many benefits in new-build roofing projects, offering many advantages to builders, and is able to be used in both traditional and timber frame constructions. Made from preformed DPC with an attached ready-shaped flashing. When laid in every course of a cavity wall external skin and against which a sloping roof abuts. The trays provide continuous stepped DPC protection running parallel with the slope. Any water and dampness in the exposed masonry skin above this stepped arrangement is prevented from gravitating in a downwards direction below it. Therefore, the masonry skin is wet above the roofline but remains dry where it becomes an internal wall. Trays come handed and, as you view the gable, the left hand trays discharge to the left and the right-hand trays discharge to the right.
Product attributes
Brand | Timloc |
---|---|
Colour | Black |
Material | Lead |
Size | 150mm Drop |
Type | Cavity Wall Trey |
Product Reviews
added to basket
View basket